top of page

OPERATIONAL CERTAINITY

BIM Coordination, Clash Detection, and Risk Mitigation for High-Stakes Projects.

INTEGRATED DELIVERY MODEL

VIRTUAL CONSTRUCTION

We build the project digitally before construction begins. This includes full-scope BIM coordination, high-fidelity 3D modeling, and comprehensive clash detection to eliminate field errors.

TECHNICAL PRECISION

We translate design intent into reality. Our teams produce precise shop drawings, fabrication models, and permit sets that meet strict regulatory and execution standards.

RISK CONTROL

We protect your margins. Through constructability analysis and data-driven decision support, we identify and resolve spatial conflicts while they are still on the screen—not on the site.

CORE EXPERTISE

CLASH DETECTION & COORDINATION

SCAN-TO-BIM / POINT CLOUD

QUANTITY TAKE-OFFS (5D)

CONSTRUCTION SIMULATION (4D)

BUILT FOR COLLABORATION

FOR DEVELOPERS

We safeguard the budget. Virtual construction reduces change orders, minimizes risk, and accelerates the handover schedule.

FOR ENGINEERS & TRADES

We validate system performance. Early clash detection ensures MEP routing fits within structural constraints before fabrication.

FOR ARCHITECTS

We protect design intent. Our coordination ensures complex geometry is constructible without compromising the aesthetic vision.

APPLIED SOLUTIONS

Digital Twin and BIM coordination model for Marbella Twin Towers super-tall structure

Marbella TWIN Tower— 
 Technical Execution for a 245m Super-Tall Structure.

The Challenge: Complexity at Scale

  • Managing a 186,913 sqm vertical ecosystem across 54 floors in an ecologically sensitive, high-humidity coastal zone.

  • Ensuring structural and mechanical certainty for a mixed-use program including a 5-star hotel, luxury residential units, and 5 levels of connected parking

​The ARX Solution: Integrated Intelligence

​​

  • Structural Stability: Implemented a reinforced central core with a Damped Outrigger System and Friction Dampers(based on Taipei 101 logic) to achieve maximum lateral stiffness against seismic and wind loads.

  • Mechanical Intelligence: Engineered a Chiller + VRF Hybrid System with multi-stage filtration units to maintain ASHRAE-standard air quality and thermal-load optimization in extreme humidity.

  • Sustainable Infrastructure: Integrated a closed-loop Greywater Recycling and Rainwater Harvesting system, managed via a centralized BMS (Building Management System) for long-term operational efficiency.

 

The Outcome: Operational Certainty

  • Used a BIM + AI Digital Twin approach to detect conflicts before the first pile was driven, ensuring zero-clash execution for complex MEP vertical runs.

  • Optimization of the energy-flow diagram via a Building Management System (BMS) to reduce long-term operational costs.

INITIATE COLLABORATION

info@arxcor.com  604-655-8641

© 2026 ARX INTERGRATED SOLUTIONS CORP. ALL RIGHTS RESERVED 

bottom of page